  • Ethiopia: 150 MW Liquid-Cooled Cluster
    Cool Space's first end-to-end hydro-cooling delivery in Africa. From site survey through grid commissioning, the project was completed in 12 months. Over three years of operation, the system has maintained 99.9% availability through local grid fluctuations, high-ambient conditions, and limited on-site maintenance resources.
    2026/10/27
  • Dubai, UAE: 10 MW Liquid-Cooled Data Center
    Dubai's summer ambient temperatures regularly exceed 40°C, with ground surface temperatures above 60°C — among the most demanding compute operating environments globally. Cool Space delivered a full hydro-cooling solution validated through thermal simulation of full-year Dubai climate data. The system has maintained PUE below 1.1 for over two years of continuous operation.
    2026/10/27
Case grouping

    Are you looking for a reliable supplier of cooling systems for large-scale hydro-cooling data center cluster?

    We can quickly provide customers with market analysis, technical support and customized services.