Days required from arrival to full commissioning?

Update Time:2026/9/17

Short answer

It depends on the model: a 12-miner micro skid can be grid-connected within half a day, while a 308-miner standard container reaches full-load commissioning in 2 to 3 days with a skilled team.

  • 12-miner micro skid: half a day
  • 308-miner container: 2–3 days
  • Skilled team, standard workflow
  • Measured to full-load commissioning

Time from arrival to full commissioning

SystemTime to full commissioning
12-miner micro skidGrid-connected within half a day
308-miner standard containerFull-load commissioning in 2–3 days

Why the numbers are this short

Containers installed and running on site
Units arrive factory-validated, so site time is spent connecting, not assembling.
  • Factory pre-integration. Assembly, wiring and thermal testing all happened before shipment.
  • A compact, repeatable workflow. Fill, vent, flush, balance, then electrical debugging and load testing.
  • Two technicians is typical. The workflow is designed for a small crew.
Hardware wall inside the container
Full-load testing is the finish line, not just power-on.
Containers in the factory before delivery
Validation happens here, before arrival.